Forum topic: New trains - next week?
Details of new Moorgate line trains
Basil Clarke
20 Feb 2016 23:44 2022
- Basil Clarke
- Topic starter
Share Share by email
Govia Thameslink Trains has concluded a financing deal which will allow it to replace the current 1976-vintage trains that run on services from Moorgate, which include the Hertford Loop. The 25 new trains, built by Siemens, will enter service in late 2018.
The Moorgate service require special dual-voltage trains as the underground section, the "Northern City Line" between Moorgate and Drayton Park, uses a DC third-rail system, while the remainder of the route uses AC overhead power.
Additionally, the short platforms on the Northern City Line mean that trains can be no more than six coaches long. In contrast with the current trains, which are made up of either one or two three-car units (ie three or six coaches in all), the new trains will be six-car units, so all services will be run by full-length trains.
According to a press release issued today, the new trains will feature:
- Fixed length with full width inter-vehicle gangways, creating more space for passengers on board (there are no intermediate cabs)
- Intelligent climate-controlled air-conditioning
- The latest in passenger information systems with real-time information
- Fully accessible and compliant with disability legislation
- Power points throughout
- Full Passenger WiFi functionality built in.
Hopefully, by the time these trains enter service, Govia will have trained enough drivers to provide a full service at weekends and during school holidays (but don't bet on it!)
Please Log in or Create an account to join the conversation.
Details of new Moorgate line trains
Karl Brown
21 Feb 2016 18:48 2023
- Karl Brown
Share Share by email
Please Log in or Create an account to join the conversation.
Details of new Moorgate line trains
Karl Brown
24 Jan 2019 14:42 4359
- Karl Brown
Share Share by email
Shiny, fresh logo's, quieter, no Metro's on the floor (yet), no graffiti (yet), no feet on seats (yet) but unfortunately no announcement at Aly Paly to say you're on the Hertford line, or not, so expect a few more of those unfortunate incidents where the scenery doesn't look as usual and the noise of the tracks a tad different to previous times and you end up having to wind your way back from wherever. (My personal best was a non stop to WGC , arriving there 23:30.)
Please Log in or Create an account to join the conversation.
Details of new Moorgate line trains
PGC Webmaster
24 Jan 2019 16:48 4360
- PGC Webmaster
Share Share by email
PS Don't try mimicking the cover shot yourself!
Please Log in or Create an account to join the conversation.
Details of new Moorgate line trains
Bill Linton
31 Jan 2019 15:35 4368
- Bill Linton
Share Share by email
Please Log in or Create an account to join the conversation.
Details of new Moorgate line trains
Basil Clarke
31 Jan 2019 16:02 4369
- Basil Clarke
- Topic starter
Share Share by email
More than mere detail of the new trains, we now have an operating photo!
Shiny, fresh logo's, quieter, no Metro's on the floor (yet), no graffiti (yet), no feet on seats (yet) but unfortunately no announcement at Ally Pally to say you're on the Hertford line, or not, so expect a few more of those unfortunate incidents where the scenery doesn't look as usual and the noise of the tracks a tad different to previous times and you end up having to wind your way back from wherever. (My personal best was a non stop to WGC , arriving there 23:30.)
On my way home from work I once got on a train at Kings X expecting to change at Finsbury Park. Unfortunately, it was one of two trains with the same departure time, and this one had first stop Royston. When we arrived there I got off, only to hear an announcement that all trains to London were halted due to a stuck level crossing. Fortunately, within half an hour they managed to unstick it and I managed to get back to PG without having to face a ticket inspector (I was using a Zone 1-4 travelcard).
Please Log in or Create an account to join the conversation.
Details of new Moorgate line trains
Karl Brown
31 Jan 2019 16:54 4370
- Karl Brown
Share Share by email
Broken down train at Drayton Park this afternoon required rerouting to KX and delayed things by about an hour. No mention if it was new variety of train or simply an old continuing to struggle. Possibly the wrong sort of snow on the tracks, or threat of.
Please Log in or Create an account to join the conversation.
Details of new Moorgate line trains
Wendy Sands
02 Feb 2019 10:25 4372
- Wendy Sands
Share Share by email
Please Log in or Create an account to join the conversation.