pgc all green working and signpost with lettering new colour 2
pgc all green working and signpost with lettering new colour 2
facebook icon twitter icon

Forum topic: New Edmonton incinerator gets government approval

Use this section to discuss planning and development topics that do not have their own section

 

New Edmonton incinerator gets government approval

Karl Brown

28 Feb 2017 16:05 2841

Share share on facebook icon share on twitter icon bluesky icon Share by email

...

Business and energy secretary Greg Clark has given the go-ahead to a new energy-from-waste plant at the Edmonton EcoPark. The plans were approved following an examination by the Planning Inspectorate which began in February 2016. It will replace Edmonton’s existing energy-from-waste facility (easily seen from the North Circular and many local spots with an easterly viewpoint) with a new plant which, unlike the old one, will produce heat as well as power. Site preparations are currently scheduled to begin in 2019 and construction in 2022 before the new facility is commissioned in 2025. The new energy-from-waste plant will have an electrical output of up to 70MW and will be able process 700,000 tonnes of waste annually. The old plant can process 550,000 of waste each year.

north london heat and power station artists impressionAn artist's impression of the planned heat-and-power station released at the time the 2015 consultationThis approach replaces the plan for a residual waste treatment plant at Pinkham Way, whereby waste would be processed into fuel pellets before being transported to the DS Smith fibre plant in Kent. The Pinkham Way Alliance (PWA) strongly resisted these plans over several years until this new approach - said to be a £900m cheaper option - was revealed.

The Authority retains Pinkham Way, a Grade 1 Site of Importance for Nature Conservation, as a “strategic asset” despite having no (public) strategy for the site. Public utterances however suggest they intend to build on the site, if possible and approved.

PWA is currently contesting the site's (unique) dual designation as Employment Land with the Planning Inspector. Following that decision it is likely the long awaited rewrite of the North London Waste Plan will be launched on its approval journey.

PWA focuses on the specific Pinkham Way site and has already saved north London's ratepayers some £900m through their campaign. Edmonton was out of area but linked representations were made up to the second stage of public consultation. The analysis suggested the proposed scale, at 700,000 tpa, was in excess of what data indicated was required, implying waste may end up being imported into north London.

Taking the analysis (see Response to Phase 2 Edmonton Consultation below) the next step to public inquiry inevitably involves professional presentation in this QC-centric cross examination stage. With the North London Waste Plan expected shortly that is why PWA needs local support, both in signing in support of their submissions, and ideally financial to meet such end-of-work professional bills. You can find out more and sign up for occasional newsletters at www.pinkhamwayalliance.org.

Links

Response to Phase 2 Edmonton Consultation - response by Karl Brown to the phase 2 consultation,  including detailed critical analysis of the assumptions behind the scheme for the large new incinerator

Public consultation: North London Heat and Power Project - June 2015 article on PGC with subsequent forum discussion

Please Log in or Create an account to join the conversation.

 

New Edmonton incinerator gets government approval

PGC Webmaster

28 Feb 2017 23:30 2842

Share share on facebook icon share on twitter icon bluesky icon Share by email

According to the specialist waste industry journal Resource, the approval by the minister came in the form of a Development Consent Order. The 14 councillors from the seven North London boroughs that make up the North London Waste Authority will consider the consent at a meeting in April and develop a strategy for delivering the scheme over the coming months. Construction preparation work could start in 2019. The existing plant would be decommissioned and demolished once the new facility is up and running by 2028.

Please Log in or Create an account to join the conversation.

Moderators: PGC WebmasterBasil Clarke
Time to create page: 0.464 seconds
Powered by Kunena

Find us on Facebook

Follow us on Twitter

Clicky